Manufacturing Capability

Production organised in stages — assembly, wiring, system debugging, inspection, packaging and shipping — with four inspection gates and records kept against each unit.

Factory overview

Production is arranged in stages rather than as a single line, because a fault caught at the stage where it occurs costs a correction, while the same fault caught at final inspection costs a rebuild.

How the line is organised

Assembly. Housing preparation, panel fitting and mechanical assembly, at dedicated stations. Enclosures are checked before assembly begins rather than after the unit is closed.

Wiring. Cable routing, connector crimping and harness assembly to the approved drawing. Wiring is labelled so that a later service visit does not depend on the original build record.

System debugging. Operating system deployment, driver installation, peripheral recognition and configuration checks on every unit. This is where a peripheral that does not enumerate correctly is caught, before the unit is packed.

Quality inspection. Four gates, described below.

Packaging. Accessory kitting, foam protection, export carton and palletisation. Custom packaging where the order requires it.

Shipping. Export documentation, forwarder coordination and delivery to the port or door as agreed in the order.

Engineering support. Drawings, interface documentation and commissioning support for your installation team, plus remote assistance after delivery.

The four inspection gates

1. Incoming inspection. Components, panels and enclosures are checked against specification on arrival — dimensions, appearance, electrical parameters and quantity. A non-conforming batch is rejected here rather than built into a unit.

2. In-process inspection. Assembly and wiring are verified stage by stage: fastening and torque, cable routing and connector seating, module mounting and interface assembly. Most latent faults are visible at the stage they are introduced, which is why this gate exists.

3. Complete-machine functional inspection. Every finished unit runs a full function test — display and touch response, printing, scanning, card reading, audio output, network and serial interfaces, and power behaviour — against the configuration agreed for that order.

4. Final inspection. Appearance, accessories, labelling, documentation and packaging are confirmed before the unit is sealed. The final inspection report accompanies the shipment.

Records and traceability

Inspection results are recorded against the unit, so a question about a specific serial number can be traced back to its production batch. Buyers with a site acceptance process can request the records for their order.

Where a buyer specifies an inspection protocol for project work, we inspect against the protocol they signed off rather than against a generic standard. Third-party pre-shipment inspection is accommodated at the agreed point in the schedule.

OEM drawings and ODM projects

We accept customer drawings for OEM work and support ODM projects where the platform is adapted to the requirement. In both cases the configuration is fixed in writing before production, and a prototype is produced and signed off where the housing changes.

About the figures on this page

Production figures — line count, floor area, team size and capacity — are published here only once they have been confirmed against current production records. Where a figure is still under confirmation it is withheld rather than displayed, because an unverified capacity claim in a tender file is a liability rather than an asset.

If you need capacity figures for a tender or a project plan, ask our team directly and we will provide the numbers relevant to your order, with the basis on which they are stated.

Production figures — line count, floor area, team size and capacity — are published here only once they have been confirmed against current production records. They are withheld rather than displayed, because an unverified capacity claim in a tender file is a liability rather than an asset.

If you need these figures for a tender or a project plan, ask our team directly and we will provide the numbers relevant to your order, with the basis on which they are stated.

The YUEQIANXIANG factory building in Foshan, Guangdong, with the company name on the facade
Our facility in Foshan, Guangdong — assembly, testing and packing under one roof.
Rows of self-service terminals powered on for ageing and function testing on the production line
Complete-machine function testing — every unit runs the display, touch, printing and interface checks.

Production capability

What happens between an order and a shipment

Production is organised in stages so that a fault is caught at the point it occurs rather than at final inspection.

  • Assembly

    Housing preparation, panel fitting and mechanical assembly, carried out at dedicated stations rather than a single all-purpose bench.

  • Wiring

    Cable routing, connector crimping and harness assembly to the approved drawing, with labelling for later service.

  • System debugging

    Operating system deployment, driver installation, peripheral recognition and configuration checks on every unit.

  • Quality inspection

    Incoming, in-process, complete-machine functional and final inspection, each recorded against the unit.

  • Packaging

    Accessory kitting, EPE foam protection, export carton and palletisation; custom packaging for project or retail delivery.

  • Shipping

    Export documentation, forwarder coordination and delivery to the destination port or door, as agreed in the order.

  • Engineering support

    Drawings, interface documentation and commissioning support for your installation team, plus remote assistance after delivery.

Quality control

Four inspection gates

Each gate has a defined check and an owner. Units that fail a gate are corrected before they advance.

01

Incoming inspection

Components and enclosures are checked against specification on arrival — dimensions, appearance, electrical parameters and quantity.

02

In-process inspection

Assembly and wiring are verified stage by stage, including torque, routing and connector seating.

03

Complete-machine functional inspection

Every finished unit runs a full function test: display and touch, printing, scanning, card reading, audio and I/O.

04

Final inspection

Appearance, accessories, labelling and packaging are confirmed before the unit is sealed for shipment.

Engineering support

Your team gets the drawings, interface documentation and configuration records needed to commission the terminals. For fleets in the field we provide remote diagnosis and repair guidance, spare-part supply and return-to-factory service.

Compliance

Certificates and test reports

Documents are listed here only once the originals have been verified.

  • CE / EMC — Component Supplier Certificate — certificate scan
    Supplier certificate

    CE / EMC — Component Supplier Certificate

    EMC test evidence for an electrical sub-assembly from a Dongguan-based electronics supplier, assessed under the EMC Directive 2014/30/EU. Published as upstream-supplier documentation; EMC conformity of a finished terminal is confirmed per configuration at the quotation stage.

    Scope
    EMC Directive 2014/30/EU — EN 55014-1:2017+A11:2020 and EN 55014-2:2015
    Issued
    2023-07-25
  • FDA Food-Contact Test — Paper Stock Supplier — certificate scan
    Supplier certificate

    FDA Food-Contact Test — Paper Stock Supplier

    Held by Xiamen Jiheng Environmental Protection Technology Co., Ltd. — upstream supplier

    Food-contact compliance testing of paper stock from a packaging supplier, against US FDA 21 CFR 176.170. The report is held by Xiamen Jiheng Environmental Protection Technology Co., Ltd. and kept on file as upstream-supplier documentation.

    Scope
    US FDA 21 CFR 176.170 — paper and paperboard in contact with aqueous and fatty foods
    Issued
    2018-05-30
  • ISO 9001:2015 — Supplier Quality System — certificate scan
    Supplier certificate

    ISO 9001:2015 — Supplier Quality System

    Issued by Intertek

    Held by Shandong Intco Medical Products Co., Ltd. — upstream supplier

    ISO 9001:2015 certificate issued by Intertek to Shandong Intco Medical Products Co., Ltd., an upstream supplier, and published here with that attribution. It documents the supplier's own quality system; YUEQIANXIANG's inspection process is documented separately on the Manufacturing page.

    Scope
    ISO 9001:2015 quality management system of an upstream supplier
    Issued
    2023-02-24
  • Restricted-Substance Test — Hot-Melt Adhesive (SGS) — certificate scan
    Supplier certificate

    Restricted-Substance Test — Hot-Melt Adhesive (SGS)

    Issued by SGS-CSTC (Guangzhou)

    Held by Guangdong Kasun New Materials and Technology Co., Ltd. — upstream supplier

    SGS test report on hot-melt adhesive from an upstream material supplier, covering EU restricted-substance requirements for materials supplied into terminal assembly. The client named on the report is Guangdong Kasun New Materials and Technology Co., Ltd.

    Scope
    EU restricted-substance requirements — hot-melt adhesive for supplier product series
    Issued
    2023-09-12
  • RoHS — Component Supplier Certificate — certificate scan
    Supplier certificate

    RoHS — Component Supplier Certificate

    Held by Shenzhen Shichuangjie Technology Co., Ltd. — upstream supplier

    RoHS Certificate of Conformity covering USB power sockets from a component supplier, assessed against the EN 50581 technical-documentation standard. Published as upstream-supplier documentation; declarations for a finished configuration are issued per order.

    Scope
    RoHS Directive 2011/65/EU — EN 50581 technical documentation, USB power sockets
    Issued
    2019-09-25

Arrange a factory visit or a video walkthrough

Buyers regularly ask to see the line before placing a first production order. We can host a visit in Foshan or run a live video walkthrough of assembly, testing and packing.